Project Overview A specialist foundation contractor engaged in a metro station package required a reliable hard rock trenching solution for the station diaphragm wall. The station box, approximately 180 m long and 25 m wide, was designed with diaphragm walls acting as both retaining structure and ...
Project Location: Kuala Lumpur, MalaysiaProduct Supplied: Modular Hydraulic Pile Breaker for Round Bored Piles (Model: APB-1300, 11 Modules)Client Type: Piling & Foundation ContractorApplication: Pile head trimming for cast-in-place bored piles 1. Project Background A leading foundation contractor ...
Project Location: Kingdom of Saudi ArabiaProduct Supplied: Excavator-Mounted Hydraulic Pile Head Breaker + Square Pile BreakerClient Type: International EPC ContractorApplication: Bridge pier foundation and highway overpass pile trimming 1. Project Background An international EPC contractor ...
Project Overview A coastal bridge and flood-control canal package in the Middle East required the installation of bored piles in soft marine clay overlying dense sand, with strict verticality tolerances and a congested waterfront working platform. The contractor deployed APIE’s crawler multi...
Project Overview A metro extension project in Southeast Asia required reliable ground improvement equipment capable of operating inside a small-section tunnel box with limited headroom and soft alluvial soil. The contractor selected the APIE HM-14 multi-functional drilling rig — a full-hydraulic, ...
Project Overview: High-Efficiency Pile Head Removal for Metro Station Construction in Manila Client: Leading Infrastructure Construction GroupLocation: Manila, PhilippinesProject Duration: 5 monthsApplication: Pile head breaking for metro station foundation and retaining wall piles Project ...
Project OverviewIn late 2024, APIE was engaged by a specialist geotechnical contractor working on a dam rehabilitation and seepage cutoff wall program in the Middle East. The scope required a plastic-concrete cutoff wall to a depth of 65 m through a highly variable profile of alluvial gravel, ...
Project Overview: Slurry Circulation System for Diaphragm Wall Construction in Bangkok Metro Extension Client: Leading Metro Construction ContractorLocation: Bangkok, ThailandProject Duration: 10 monthsApplication: Slurry circulation and transport for trench cutter diaphragm wall construction ...
Project Overview: Enhancing Pile Breaking Speed for Major InfrastructureIn early 2025, a leading construction firm in Thailand was contracted for a critical section of a new high-speed rail line. The project required the removal of over 3,000 concrete pile heads ranging from 400mm to 1000mm in ...