HPR45-16 Piling Rig 16m Depth 300-1000mm Bore Pile Machine For Ground Anchor Pile Rows
HPR45-16 Solar Farm Piling Rig
,Ground Anchor Drilling Machine
,Rack Foundation Pile Rig
HPR45-16 Piling Rig for Solar Mounting and Ground Anchor Piles
Solar farms and ground mounted racking need thousands of shallow to medium piles across uneven terrain, fast. The HPR45-16 fixed mast rig with 45 kNm torque, 60 m/min main winch speed and 16 m depth capability drills anchor and rack foundation piles in a single pass, and the 2.9 m transport height keeps it moving between arrays on a standard low bed.
Low Headroom Advantages
- 60 m/min main winch lifting speed shortens each drilling cycle
- 45 kNm rotary head with 1500 mm stroke for fast anchor pile drilling
- 16 m depth capability also covers deeper rack foundation designs
- 2.9 m transport height and 6.9 m transport length for rapid array to array moves
- 45 kN lifting force handles casing and tooling without a second machine
Technical Specifications
| Drilling Depth (Max) | 16 m |
| Drilling Diameter (Range) | 300~1000 mm |
| Kelly Bar (Size) | 245 x 4 x 4.5 m |
| Lateral Tilt Angle | 5° |
| Forward Tilt | 5° |
| Backward Tilt | 87° mast folding |
| Rotary Head Output Torque | 45 kNm |
| Rotation Speed | 7~40 rpm |
| Max Stroke | 1500 mm |
| Pressure Force | 45 kN |
| Lifting Force | 45 kN |
| Lifting Capacity | 45 kN |
| Main Winch Lifting Speed | 60 m/min |
| Main Winch Rope Diameter | 16 mm |
| Auxiliary Winch Lifting Force | 15 kN |
| Auxiliary Winch Lifting Speed | 40 m/min |
| Auxiliary Rope Diameter | 10 mm |
| Engine | Isuzu 4JG3X |
| Operating Weight | 12000 kg |
| Working Height | 8.2 m |
| Transport Height | 2.9 m |
| Transport Length | 6.9 m |
| Transport Width | 2.3 m |
| Excavator Chassis | SANY SY75C |
* Actual depth performance may differ due to soil condition, machine performance and operator skills.
Typical Applications
- Solar farm ground anchor and rack foundation piles
- Wind turbine auxiliary foundation piling
- Ground screw and micro pile anchoring
- Agricultural structure and greenhouse foundation piles
- Transmission line guy anchor piling
Standard Supply Scope
- Main machine with SANY SY75C crawler chassis
- Kelly bar 245 x 4 x 4.5 m
- Anchor pile adapter and auger set
- Main winch 16 mm rope and auxiliary winch 10 mm rope at 15 kN
- Isuzu 4JG3X engine with electronic display
Why Contractors Choose This Rig
Energy projects are measured in piles per day and cost per pile. High winch speed, 1500 mm stroke and a 45 kNm head keep cycle time down, and the compact transport envelope means the rig follows the array line instead of waiting for a crane.
Battery or hybrid drive configuration can be discussed for sites with strict emission limits.
Contact
APIE FOUNDATION EQUIPMENT (CHINA) LIMITED
Add: NO.108-4-1911 Huishan Avenue, Huishan Zone, Wuxi City, Jiangsu Province, China
Tel: +86-18921287030 | Fax: +86-510-83790757
E-mail: apie@apiepiling.com |