logo
Send Message
APIE FOUNDATION EQUIPMENT (CHINA)LIMITED
Email apie@apiepiling.com TEL: 86--18921287030
Home > products > Drilling Rig Tool >
Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile
  • Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile
  • Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile
  • Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile
  • Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile
  • Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile

Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile

Place of Origin China
Brand Name APIE
Certification CE
Model Number AP273-3
Product Details
Procuct Name:
Tremie Pipe
Condition:
New
Applicable Industries:
Building Material Shops, Machinery Repair Shops, Manufacturing
Machinery Test Report:
Provided
Video Outgoing-inspection:
Provided
Marketing Type:
New Product 2022
Thickness:
3mm/3.5mm/4.0mm
Warranty:
6 Months
Accessories:
Hopper, Connections, Turning Plate
Material:
Steel Pipe
Color:
Customized
Application:
Construction Tremie Pipe
MOQ:
1 Piece
Process:
Forging And Welding
Delivery Time:
5-8 Work Days
Supply Ability:
200 Pieces/30 Days
Highlight: 

Length 3m Tremie Pipe

,

Concrete Hopper Tremie Pipe

,

Tremie Pipe For Bored Pile

Payment & Shipping Terms
Minimum Order Quantity
1 Meters
Price
$20+
Packaging Details
Nude packing or Steel tank for export for tremie pipe
Delivery Time
5-8days
Payment Terms
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability
1000 Meter/Meters per Week
Product Description

length 3m Drilling Rig Accessories Steel Pipe Material concrete Hopper tremie pipe for bored pile

 

Product description

1.APIE tremie pipes are made of quality drawn steel plates in order to guarantee high resistance elements.
2.Tremie pipes are equipped with male / female joints with thread.
3.Standard tremie pipe contains bottom tube, short tube, standard tube. bottom tube is 4m, standard3m, short for 0.5-2m.
4.Tremie pipes are normally used to pour concrete into a drilled pile, after the steel cage reinforcement is placed in operation, to avoid concrete pile breakage or gaps. During the operations they are lowered inside and through the steel cage reinforcement to protect concrete from soil contamination water filtering and to avoid any possible concrete quality corruption. Tremie pipes are made of quality drawn steel plates in order to guarantee high resistance elements.

 

Product parameters

Item

 

Description

 

Model

1

 

Tremie pipe with wire cable coupling Diameter 273mm
Length 3m
Wall thickness 4.5mm

 

KTP273 -3

2

 

Tremie pipe with wire cable coupling Diameter 273mm
Length 1.5m Wall thickness 4.5mm

 

KTP273 -1.5

3

 

Tremie pipe with wire cable coupling Diameter 273mm
Length 1m
Wall thickness 4.5mm

 

KTP273 -1

4

 

Tremie pipe with wire cable coupling Diameter 273mm
Length 0.5m Wall thickness 4.5mm

 

KTP273 -0.5

5

 

Wire cable

 

KTP Cable

6

 

Tremie Jig Length 2.5m, Width 0.5m

 

KTJ-2.5

7

 

Tremie Rack for Length 30m

 

KTPF-30

8

 

Lifting Cap for 273mm tremie pipe

 

KTP LC-273

9

 

Tremie Hopper Size 1.5m³

 

KTP TH-1.5

 

Tremie Pipe
ΦC(mm)
Female Joint
ΦA(mm)
Male Joint
ΦB(mm)
Recommended Pile
Diameter(mm)
Recommended Volume(m³) Tremie Pipe Thickness(mm) Seal type
219 274 248 Φ500-Φ700 1 3/3.5/4 O seal ring
260 325 294 Φ700-Φ1000 1.5 3/3.5/4 O seal ring
300 374 338 Φ1000-Φ1500 2.0 3/3.5/4 O seal ring

 

Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile 0

Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile 1

Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile 2

Length 3m Drilling Rig Steel Pipe Material Concrete Hopper Tremie For Bored Pile 3

 

FAQ

Q1: Are you a trading company or a manufacturer?
A1: We are a professional manufacturer, and our factory mainly produces hydraulic pilling rig, hydraulic pile breaker, telescopic arm and related piling equipment etc. Our products have been exported to more than 50 countries of Asia, South America, Africa,and have developed a good world wide reputation.

 

Q2:What kind of product certification do you have?
A2: All our products have passed ISO9001 and CE certifications and also passed the inspection by the Chinese National Construction Machinery Quality Inspection Center. We have strict quality inspection process including a load test for every machine before leaving our factory in order to offer the best quality machines to our customers .

 

Q3: Do you have after sales service?
A3:Yes, we have special service team which will offer you professional guidance. If need be, we can dispatch our engineer to your worksite to provide training for your staff.

 

Q4:Do you test all your goods before delivery?
A4:Yes, we have strict quality inspection process including a load test for every machine before leaving our factory.

 

Contact Us at Any Time

86--18921287030
NO.108-4-1911 HUISHAN AVENUE,HUISHAN ZONE,WUXI CITY, JIANGSU PROVINCE,CHINA 214174
Send your inquiry directly to us